Project Need

  • This project increases transmission system reliability
  • This project eliminates known deteriorating and non-standard assets from the transmission system. Current challenges include the following:
    • Cormorant colony roosting/nesting opportunities and associated contamination
    • Three lattice towers with deteriorating pile and cap foundations
    • Navigable waterway clearance challenges
    • Aging steel structures in a majority-wood pole transmission line

Project Description

  • Rebuild two existing single-circuit 115 kV transmission lines crossing Bush River on the Perryman to Edgewood line
  • The existing lattice structures will be replaced with double-circuit steel monopole structures
  • Overall project length is less than 1 mile
  • This project is subject to PSC approval and design changes

Resources

  • Bush River Crossing Public Outreach Presentation - April 2, 2020

  • Bush River Crossing FAQs - April 1, 2020

  • Bush River Crossing Project Open House Re-Scheduled - March 24, 2020

  • Bush River Crossing Project Open House Postponed - March 12, 2020

  • Bush River Crossing Project Open House - March 3, 2020

Timeline

May 2019

Begin Design and Engineering

April 2, 2020

Bush River Community Outreach Meeting

December 2020

Complete Design and Engineering

April 2020 – May 2020

CPCN Process

September 2021

Construction Start

December 2022

Project Service Date

Photo Simulation 1

View from the end of Kennard Ave looking southeast. This project is subject to PSC approval and design changes.

Viewpoint Location Map

Web_InsetMap_BushRiver_VP1-LG

Photo Simulation 2

View from within the existing right-of-way on the western shore looking east. This project is subject to PSC approval and design changes.

Viewpoint Location Map

Web_InsetMap_BushRiver_VP2-LG

Photo Simulation 3

View from within the existing right-of-way on the eastern shore looking west. This project is subject to PSC approval and design changes.

Viewpoint Location Map

Web_InsetMap_BushRiver_VP3-LG

Photo Simulation 4

View from within the existing right-of-way looking west. This project is subject to PSC approval and design changes.

Viewpoint Location Map

Web_InsetMap_BushRiver_VP4-LG

Construction Sequence

Construction sequence graphics are intended to provide an overview of the typical construction sequence for a project. These graphics are used to give stakeholders a general idea of what to expect regarding this project’s construction process and effort. This project is subject to PSC approval and design changes.

Right of Way Path

Contact BGE

If you have any questions about this project, please contact BGE at bushriver@bge-tsrep.com and refer to the Bush River Crossing 115 kV Line Rebuild Project. Please include your name and address for prompt follow-up.