Project Need
- This project increases transmission system reliability
- This project eliminates known deteriorating and non-standard assets from the transmission system. Current challenges include the following:
- Cormorant colony roosting/nesting opportunities and associated contamination
- Three lattice towers with deteriorating pile and cap foundations
- Navigable waterway clearance challenges
- Aging steel structures in a majority-wood pole transmission line
Project Description
- Rebuild two existing single-circuit 115 kV transmission lines crossing Bush River on the Perryman to Edgewood line
- The existing lattice structures will be replaced with double-circuit steel monopole structures
- Overall project length is less than 1 mile
- This project is subject to PSC approval and design changes
Resources
Timeline
November 2018 - August 2021
Permitting Process
May 2019
Begin Design and Engineering
April 2, 2020
Bush River Community Outreach Meeting
December 2020
Complete Design and Engineering
April 2020 – May 2020
CPCN Process
February 9, 2021
9642 Public Comment Hearing
September 2021
Construction Start
May 2022
Project Service Date

Photo Simulation 1
View from the end of Kennard Ave looking southeast. This project is subject to PSC approval and design changes.
Viewpoint Location Map


Photo Simulation 2
View from within the existing right-of-way on the western shore looking east. This project is subject to PSC approval and design changes.
Viewpoint Location Map


Photo Simulation 3
View from within the existing right-of-way on the eastern shore looking west. This project is subject to PSC approval and design changes.
Viewpoint Location Map


Photo Simulation 4
View from within the existing right-of-way looking west. This project is subject to PSC approval and design changes.
Viewpoint Location Map

Construction Sequence
Right of Way Path